Railway Construction and Maintenance Machines
Konepaja Mankinen offers mechanical engineering services and Enerco products, including:
Rail Track Maintenance Devices
Tehtaankatu 9,
11710 Riihimaki,
Finland
Konepaja Mankinen develops and manufactures ENERCO® track maintenance machines, specialised railway building applications and devices.
All of our equipment has been designed, tested and used in adverse weather conditions and at a temperature range between -40°C and 45°C.
Mankinen’s key products include rail wheel sets for universal excavators with height limiter switches and other safety devices. We also deliver rail wheel sets in different specifications and manufacture customised devices, which are based on the client’s requirements.
Our products are fitted with a quick-change clamping mechanism and used with 15t to 20t class excavators, in order to ensure effective working processes with high-performance and less manpower to reduce risks and costs.
The ENERCO excavator-mounted PM-20 combination device has both a rail grabbing and rail guiding feature. The turning movement from grabbing to guiding as well as tilt motion is executed by an optional rotating-tilt head. All the power-operated functions are hydraulic.
The rail guidance feature is made by locating the free-rolling steel wheels under the rail head and pushing the wheels forward with an excavator boom. So, by this way, the excavator builds a new rail for itself.
The PM-20 can lift and handle different profile rails, which measure up to 150m in length.
Our ENERCO RT-10 is an excavator-operated hydraulic vibrating tamping aggregate for sleepers, rails, joints and switches with four identical, easily exchangeable tools with a length of 540mm.
The excavator must be equipped with a rotating-tilt head for optimum performance. The device has an adjustable stopper to configure the tamping depth.
The K-125 snow brush with built-in scraper plate efficiently cleans rails and platforms, and with its hard metal scraper, the K-125 also easily removes hard snow and ice.
ENERCO’s new CSC-100 excavator boom-mounted combination device collects crushed stone, macadam and ballast debris from around the sleeper by the narrow clamshell grab and then tilts the device by 90° by Rototilt.
The device features floating, rubber-coated clampers, which can clamp, shift and change sleepers on different locations in and out.
The KT-30 rail gap adjuster is equipped with a man-powered double-acting hydraulic unit with a pulling and pushing force of 30kN. Its jaws will be clamped on both sides of the rail top and the insulation joint between the rail ends can be easily mounted or changed.
The adjuster is equipped with steel wheels to simplify its movement on the rail.
ENERCO’s D-5 profile grinder is equipped with two sets of rail wheels.
There are three versions available: a two-stroke, four-stroke gasoline engine and electrical motor for indoor use. A special version is also available for rail crossings.
The construction of grinding stone feed gear is unique, durable and airtight against dust and feed inclination. The frame has a pedal with three fast-locking positions, which can be fixed against the running surface, edge and side of the rail head.
The R-Emergency trolley manufactured by ENERCO is used, for example when there is an accident and bearing breakdown in wagon.
With a maximum axle load of 31t, the problem rail wheel pair can be loaded onto the trolley and towed away for repairs.
A supplier of new and second-hand equipment, Mankinen has been developing rail track maintenance machines and devices for more than 60 years.
We produce all ENERCO products in-house, which gives us a fast and flexible production lead time and a short reaction time in service cases and customising.
Konepaja Mankinen offers mechanical engineering services and Enerco products, including:
Midland Main Line (MML) runs between London St Pancras and Sheffield, bypassing Luton, Bedford, Corby, Leicester, East Midlands Parkway, Derby, Nottingham and Chesterfield in the UK.
Western Dedicated Freight Corridor (DFC) is a broad gauge corridor under construction that will connect the national and business capitals of India - Delhi and Mumbai.
The Pink Line monorail project is a 34.5km mass transit system being developed between Khae Rai and Min Buri in Bangkok, Thailand.
Connected to the South Morang railway line tracks until Clifton Hill, the Hurstbridge suburban railway line in Melbourne, Australia, is being upgraded with the aim of improving the frequency and reliability of services in Melbourne's north-east.
The Murray Basin rail project, initiated in February 2015, includes significant upgrades on Victoria's rail freight network in order to standardise the rail freight services across Northern Victoria and increase the freight capacity.
The Sunset Tunnel trackway improvement project was initiated by San Francisco Municipal Transportation Agency (SFMTA) in August 2014.
Tehtaankatu 9
11710 Riihimaki
Finland