Skip to site menu Skip to page content

Subscribed

You have successfully submitted your enquiry. Someone from our company will respond ASAP

Progressive Assembly Reduces Lead Times by One Third

With the Voith Powerpack, a drive system consisting of engine, turbo transmission, cooling unit and electronic control unit combined in a Voith Flexframe, Voith Turbo has made a name for itself in the rail industry as a systems supplier. In order to optimize the assembly of its Powerpacks, Voith Turbo has now introduced a line production system after the Kanban principle. As a result, lead times can be decreased by one third, which also reduces costs.

Related Content