Czech Railways (CD) has unveiled a programme to equip up to 663 vehicles with on-board equipment for the implementation of European Train Control System (ETCS) Level 2.

According to CD, the communication between trackside equipment and a controller in the train cab will further improve safety on its railway lines.

Discover B2B Marketing That Performs

Combine business intelligence and editorial excellence to reach engaged professionals across 36 leading media platforms.

Find out more

With the new control system, trains could be stopped in a timely manner ahead of a stop signal, even if the train driver is incapacitated.

”The safety of CD trains is a priority for us. We have already equipped 1,191 vehicles with the GSM-R European communication system".”

CD will be installing the new signalling equipment on 33 different classes of train, including the 151, 371, 380, 660/661 InterPanter, 680 Pendolino, CityElefant, and RegioPanter electric multiple units (EMUs).

The control system will also help reduce a train’s speed before taking a diverging track, or before a speed reduction on the line.

CD chairman Pavel Krtek said: "The safety of CD trains is a priority for us. We have already equipped 1,191 vehicles with the GSM-R European communication system and 1,535 vehicles with the TRS national radio communication system.

GlobalData Strategic Intelligence

US Tariffs are shifting - will you react or anticipate?

Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.

By GlobalData

"This enables traffic controllers and dispatchers to stop a train during an extraordinary event, even remotely by means of a general stop, and thus contributes significantly to the high degree of safety on the Czech railway network."

The equipment will be supplied and installed under a single contract with an estimated value of around CZK6.6bn ($276m).

The funding will be sought from the European Union’s (EU) Connecting Europe Facility (CEF), which could cover up to 85% of the cost of the project.

Krtek further noted: "The most modern interoperable ETCS control system further enhances the safety of our trains. For example, the system is able to stop a train in time even before a stop signal, before a ‘red light’, beyond which there may be another train.

"At a speed of 160km/h, the brakes must be deployed hundreds of metres in advance. The system also eliminates human error in the case of reduced speed when taking a diverging track, for example when arriving at stations or on the line before a significant speed reduction when entering a tight curve."

CD has already equipped class 151 and 362 locomotives, and a class 471 EMUs with ETCS Level 2 for pilot deployment between Porícany and Kolín.

Railway Technology Excellence Awards - Nominations Closed

Nominations are now closed for the Railway Technology Excellence Awards. A big thanks to all the organisations that entered – your response has been outstanding, showcasing exceptional innovation, leadership, and impact across the defence sector.

Excellence in Action
MTR Corporation and Dragages Hong Kong triumphed in three categories – Research & Development, Environmental and Safety – for their Kwu Tung Station project . Learn how this future Northern Link–East Rail Line interchange sets new benchmarks in digital construction, decarbonisation and safety management.

Discover the Impact