Siemens Mobility wins contract to upgrade Belgian Railways fleet
Now, Belgian Railways will be able to meet the latest European standards baseline V3.6.0 for rail safety.

Now, Belgian Railways will be able to meet the latest European standards baseline V3.6.0 for rail safety.
A new double-track, electrified high-speed rail track will be developed between Ispartakule and Cerkezkoy.
The solution is projected to provide better connectivity and automation.
Thales' TTC track circuit allows the installation of 16 units on each frame.
The installation of new mechanical and electrical systems is projected to cut down upkeep expenses.
This agreement will be valid for two decades.
As part of the project, around 10.46km of signals have been replaced.
These 200m-long, eight-car trains will be built at facilities located in County Durham, Derby and Crewe.
The newly engineered gondolas will provide better sustainability and a prolonged lifecycle.