Nencki Presents Innovations for Bogie Testing and Maintenance
Nencki will be presenting its range of bogie testing and maintenance solutions at Innotrans 2018....
Transnet Engineering has decided to purchase an NBT Loco 2 x 450 kN bogie test stand from Nencki, the first such Nencki unit to be used in South Africa. This three-axle test stand will be operational at the company’s factory in Pretoria from August 2014.
Transnet Engineering is currently working in a joint venture with Chinese firm CSR.
The Pretoria factory produces, assembles and tests up to 1,000 bogies every year. The periodical maintenance of the used bogies also takes place at the facility.
Please contact Nencki to find out more.
Nencki will be presenting its range of bogie testing and maintenance solutions at Innotrans 2018....
Alstom Limache in Chile is carrying out maintenance work for Metro Merval in the Valparaiso harbour...
The first spring test press of the NST E generation will be supplied to Transnet...
Nencki Railway Technology has achieved a worldwide leading position with large professional competence in the...