Delhi Metro Rail (DMRC) has opened the final major section of the automated Line 7 for passenger operations.

The Lajpat Nagar–Mayur Vihar Pocket 1 Metro section stretches 9.7km and comprises three underground and two elevated stations. The section will offer connectivity between the southern and eastern regions of the city.

Discover B2B Marketing That Performs

Combine business intelligence and editorial excellence to reach engaged professionals across 36 leading media platforms.

Find out more

Delhi Metro Rolling Stock and Signalling director S S Joshi said: “The opening of this last section of our new, fully automated Line 7 is a major milestone in the expansion of integrated public transportation in Delhi.

“The line is already easing pressure on the existing network and is improving travel for millions of commuters.”

Known as the Pink Line, Delhi Metro Line 7 started operations in March last year. The line is equipped with Bombardier CITYFLO 650 driverless rail control technology.

“The line is already easing pressure on the existing network and is improving travel for millions of commuters.”

The communications-based train control solution CITYFLO 650 utilises modern radio networks and moving block operations to offer centralised train supervision and reliable automatic operations.

GlobalData Strategic Intelligence

US Tariffs are shifting - will you react or anticipate?

Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.

By GlobalData

The Delhi Metro Line 7 is capable of running trains every one and a half minutes. It can support train speeds of up to 85km/h.

Bombardier Transportation Rail Control Solutions India head Rasmi Ranjan Ray said: “It has been a momentous experience to see the start of services on Delhi’s first fully automated metro line.

“This latest section to open marks a major milestone for DMRC in its introduction of driverless, high-capacity services.”

Running adjacent to the city’s Ring Road, Delhi Metro Line 7 features a 58.5km circular route from Majlis Park to Shiv Vihar Station.

DMRC has opened 96km of metro sections in the last year, including the Line 7 extension.

Delhi Metro includes 327km of rail network with 236 stations.

Railway Technology Excellence Awards - Nominations Closed

Nominations are now closed for the Railway Technology Excellence Awards. A big thanks to all the organisations that entered – your response has been outstanding, showcasing exceptional innovation, leadership, and impact across the defence sector.

Excellence in Action
Winning the Innovation Award in the Reservation Systems category, EAO’s advanced seat reservation system tackles urbanisation and rising mobility demands head on. Explore how its adaptable HMI, modular design and energy saving display technology help operators boost capacity utilisation and improve the passenger experience.

Discover the Impact