MPB Structures, a civil engineering specialist based in Birmingham, UK, has been selected to construct the substructure foundations for High Speed Two’s (HS2) Curzon Street Station by Mace Dragados Joint Venture.

The company is set to commence construction on the substructure of the station in 2025.

Discover B2B Marketing That Performs

Combine business intelligence and editorial excellence to reach engaged professionals across 36 leading media platforms.

Find out more

Curzon Street Station is expected to become the main hub within the UK’s high-speed rail network, enhancing connectivity in Birmingham’s Eastside and Digbeth areas.

The station will offer seamless integration with local transport services, including buses and the Midland Metro tram line.

The contract follows an extensive piling operation being undertaken by Keltbray, which is set to install 2,000 concrete piles to support the station’s foundations.

Around 140 personnel from MPB will begin working on-site, tasked with the complex construction of the station’s substructure.

GlobalData Strategic Intelligence

US Tariffs are shifting - will you react or anticipate?

Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.

By GlobalData

This phase includes the excavation of 65,000m³ of earth and the use of approximately 17,000m³ of concrete to set 417 pile caps, along with the integration of over 4,700 tonnes of reinforcing steel for the station’s ground beams.

The MPB team will also be responsible for waterproofing the new concrete structures, establishing the station’s drainage network, and constructing attenuation tanks for rainwater storage, which will be recycled within the operational station.

MPB Structures board director and business owner Patrick Boyle said: “We are delighted to have secured this prestigious contract on the Curzon Street Station build.

“Our business has a long and rich history of successfully delivering major projects for key clients across Birmingham and the wider West Midlands.”

The next phase of contracts, to be awarded in the coming months, will focus on the station’s superstructure, including the floor slab, lift shafts, stairs, and columns to support the viaducts for incoming trains.

Subsequent contracts will cover the station’s facade, walls, and glazing, with the design set to be finalised over the next year.

The station’s design focusing on details such as the roof and internal fit-out will be finalised next year.

The development plans also include the creation of new public spaces, featuring two squares and a promenade.

In 2021, Mace and Dragados’ joint venture won the £570m ($805.43m) contract to build HS2’s Birmingham Curzon Street Station in the UK.

Railway Technology Excellence Awards - Nominations Closed

Nominations are now closed for the Railway Technology Excellence Awards. A big thanks to all the organisations that entered – your response has been outstanding, showcasing exceptional innovation, leadership, and impact across the defence sector.

Excellence in Action
Winning the Innovation Award in the Reservation Systems category, EAO’s advanced seat reservation system tackles urbanisation and rising mobility demands head on. Explore how its adaptable HMI, modular design and energy saving display technology help operators boost capacity utilisation and improve the passenger experience.

Discover the Impact