Spanish engineering services provider Ardanuy Ingeneria has secured a contract to carry out the design works of Rail Baltica stations at Harju as well as Pärnu counties in Estonia.

This covers design of seven stations – Kaisma, Tootsi and Urge stops in Pärnu County along with Assaku, Luige, Saku and Kurtna stops in Harju County.

Discover B2B Marketing That Performs

Combine business intelligence and editorial excellence to reach engaged professionals across 36 leading media platforms.

Find out more

The design contract is worth €368,000, excluding VAT.

Rail Baltica project’s national implementing body in Estonia, Rail Baltic Estonia, reached an agreement with the Spanish firm in this regard.

The contract covers design for waiting platforms, overpasses and underpasses.

It also includes design for parking lots, outdoor areas, as well as access roads.

GlobalData Strategic Intelligence

US Tariffs are shifting - will you react or anticipate?

Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.

By GlobalData

Design works will be carried out for five months, while building permit applications will take another three months.

As per plans, railway facilities linked to the regional stations will be developed at the same as the mainline construction.

Service facilities’ construction will commence immediately prior to the launch of rail operations.

The standard projects’ preliminary designs for the transition between station buildings and waiting platforms have been done, and work on preliminary designs for outdoor areas, access roads, and parking lots are underway, executed by AS Novarc Group.

Regional trains will operate from Tallinn to Riga, with 13 stops in Estonia, under the Rail Baltica project.

Rail Baltic Estonia senior project manager Rauno Lee said: “For the crossings between the station buildings and waiting platforms, the completed standard solutions, which are part of the existing design of Raplamaa regional station, will be used and adopted to local conditions.”

“At the same time, detailed plans have already been initiated for nine regional stations on the Tallinn-Pärnu section, whereas detailed plan for the Assaku regional station planned by Rae parish is still to be initiated,” he added.

He further noted that work on Rail Baltica regional stations is underway almost along the entire Estonia mainline, except Häädemeeste and Surju.

Earlier this month, three international consortiums qualified for stage two of the Rail Baltica energy subsystem design and construction procurement.

Railway Technology Excellence Awards - Nominations Closed

Nominations are now closed for the Railway Technology Excellence Awards. A big thanks to all the organisations that entered – your response has been outstanding, showcasing exceptional innovation, leadership, and impact across the defence sector.

Excellence in Action
Winning the Innovation Award in the Reservation Systems category, EAO’s advanced seat reservation system tackles urbanisation and rising mobility demands head on. Explore how its adaptable HMI, modular design and energy saving display technology help operators boost capacity utilisation and improve the passenger experience.

Discover the Impact