Divaca-Koper Railway Line Track Doubling

The estimated cost of the second track along the Divača-Koper railway line is €1.19bn ($1.33bn). Credit: 2TDK doo.



  • Divaca-Koper Railway Line Track Doubling
  • Divaca-Koper Railway Line Track Doubling
  • Divaca-Koper Railway Line Track Doubling
  • Divaca-Koper Railway Line Track Doubling