Over 300km of the route is built on viaducts or in tunnels.
-
The first new Taiwan high speed train, built by Kawasaki. -
Schematic track laying features. -
Pre-fabricated slab track has been employed throughout. -
An artists impression of the plush interior of the new high-speed trains. -
Japanese technology was chosen for the new trains. -
Stations are built to withstand trains passing at 350km/h. -
The trains will be controlled from the most modern and technologically... -
The sturdy overhead is capable of upgrading to 30kV AC. -
The undulating nature of the trackbed is clear to see in this view. -
Over 300km of the route is built on viaducts or in tunnels.