Home > Industry Projects > High Speed Railways > Speedrail
Specifications - Speedrail High-Speed Rail Link, Australia
| Key Data |
| Operator | Speedrail |
| Opening Date | October 2006 |
| Route Length | 270km (185 miles) |
| Maximum Line Speed | 300km/h |
| Gauge | 1,435mm |
| Power | Multi-voltage |
| | 1,500V dc |
| | 25kV ac |
| | 15kV ac |
| | 3kV ac |
| Rolling Stock |
| Type | TGV derivative, with Thalys-design intermediate coaches |
| Builder | Alstom/Francorail-MTE-de Dietrich |
| Fleet Total | Nine sets, each of eight vehicles |
| Build Date | n/a |
| Electrical Equipment | Alstom |
| Trainset Power | 6,300–9,300kW |
| First-class seats/car | To be decided |
| Second-class seats/car | To be decided |
| Special Characteristics |
| | Government financial support withdrawm for the time being |
| | Travel on new alignments, but existing tracks through city suburbs |
| | Widely used, proven technology employed |
| | 30-year concession to project partners Alstom and Leighton |
| | Potential pathfinder for other high-speed railways in Australia |
| | Three-year construction project expected to create 15,000 jobs |
| Featured Suppliers |
| 3M - Rail Fixing Materials, Sealants and Adhesives |
| ALSTOM - ONIX™ Invisible Traction Systems and AGATE™ Electronic Systems |
| ALSTOM - Power Supply to Substations and Catenaries |
| ALSTOM - Very High Speed, Intercity and Surburban Trains |
| Federal Mogul Systems Protection - Sleeving Solutions |
| Pandrol Rail Fastenings - Rail Fastening Systems |