Line 17 will be constructed in two phases. The first phase is scheduled to become operational in 2013 and the second in 2014.
-
Line 17 - Gold is a 17.7km monorail system in Sao Paulo, which will connect... -
It is one of the three monorail lines being planned for Sao Paulo. The city's... -
Line 17 will be constructed in two phases. The first phase is scheduled to...