Specifications - TGV Rhine-Rhone, France
| Key Data |
| Operator | SNCF |
| Opening date | 2011 (planned) |
| Route length | 425km split into three sections: |
| Maximum line speed | 320km/h |
| Gauge | 1,435mm |
| Electrification |
| Voltage | 25kV AC, 50Hz |
| Rolling Stock |
| Type | TGV |
| Builder | Alstom, Francorail-MTE, de Dietrich |
| Fleet total | 300+ |
| Build date | 1978-present |
| Electrical equipment | Alstom |
| Trainset power | 6,300kW to 9,000kW |
| Special Characteristics |
| | First phase of new project will massive reduce journey times between France and Switzerland, France and Spain and France and Germany |
| | Construction began in June 2006 with a 2011 opening date scheduled |
| | Finance has come from France and Switzerland to the tune of €2.3bn |
| | 160 bridges to be built along the eastern branch |
| | Western and southern branches at preliminary study stage |
| | 320km/h operation planned |