Kashmir Railway

Specifications - Kashmir Railway Project, India


System
OwnershipIndian Railways
Opening date2007 – 45km isolated section, followed by full Qazigund-Baramulla section by late 2007
Full opening date2009
Route length290km
Gauge1676mm
Stations30
Ruling gradient1%
Minimum curve radius676m
Maximum design speed100km/h
Rolling Stock
Passenger trainsDiesel multiple units
Freight trafficGrain and petroleum
Special Characteristics
 Railway crosses inhospitable terrain to link central India with Kashmir
 Railway route will replace dangerous hairpin road as main mode of transport to the isolated region
 Journey times will be halved to six hours
 Konkan Railway Construction Corp. is building the world’s highest railway bridge on the route to cross the Chenab River
 75% of the route between Udhampur and Qazigund is in tunnels
The Chenab River Crossing
Total length1,315m
Maximum height359m above the river bed


client logon
Home
Products & Services
Company A-Z
White Papers
Features
Industry News
New On This Site
Jobs & Careers
Events & Exhibitions
Newsletter
Advertise With Us
About Us
Atom FeedRSS Feed
What is RSS?