Cross River Tram, London, United Kingdom

 
Key Data:
Project sponsor
Transport for London
Key supporter
Cross River Partnership
Route length
16.5km (10.25 miles)
Passenger volume
7,000 each way/hour (peak)
Principle heavy rail connections
5
Underground connections
12
Depots
tbc
Vehicle supplier / numbers
tbc
Power supply (probable)
750v dc overhead
Special Characteristics:
Return of trams to central London after over 60 years
Croydon Tramlink used to support the case
High-capacity vehicles at two-minute intervals
Varied levels of support for the scheme
Original plan may be split into two projects