The initial portion of the 10km railway section will feature four tunnels with a total length of 2.5km.
-
The project is being financed by the Bergen Municipality and other sources. -
The average operating speed of the system will be about 25km/h to 30km/h. -
The project will feature an integrated smart-card ticketing system. -
Trains will operate on 5min headways in each direction during peak traffic... -
The initial portion of the 10km railway section will feature four tunnels. -
Major stations on the rail system will include parking facilities to... -
A light rail system was proposed in 2000 and approved in 2002.