| Key Data | |
|---|---|
| Operator | Chinese Ministry of Railways |
| Opening date (planned) | 2010 |
| Route length | 1,318km |
| New stations | 24 |
| Maximum line speed | 300km/h (186mph) |
| Gauge | 1,435mm |
| Number of staff (Total) | 1.9 million |
| Extensions planned | None |
| Electrification | |
| Voltage | 25kV |
| Current | ac overhead |
| Rolling Stock | |
| Number of vehicles | not yet finalised |
| Capacity | not yet finalised |
| Special Characteristics | |
| Template for future high-speed network in China | |
| Area served produces 40% of national wealth | |
| Completion creates capacity for slower passenger and freight services on existing routes | |
| Incorporates western technology draws | |
| Line will be engineered for 350km/h maximum speeds | |
| Major new crossings of the yellow and Yangtse rivers | |
| Featured Suppliers | |
| BWG - Turnout Technology for High-Speed and Standard Railways, Urban Traffic and Heavy Haul Equipment | |
| ContiTech Railway Engineering - Railway Suspension Systems | |
| Faiveley Transport - Passenger Access Products, Air Conditioning, High-Voltage Solutions and On-board Electronics | |
| HEURTEAUX - 'Caoutchouc Ignifugé' - Fire Resistant Rubber Profiles and Gaskets for the Rail Industry | |
| Nexans - Cables for Rolling Stock, Signalling and Rail Infrastructure | |
| PINTSCH BAMAG - Level Crossing Technology, Point Heating Systems, Door Systems and Railway Vehicle Components | |
| Saargummi - Vibration and Noise Reduction Systems / Foamed EPDM Elastomer | |
| Voith Turbo - Power Transmissions, Couplers and Retarders for Rail Vehicles | |