Home > Industry Projects > High Speed Railways > Ankara-Istanbul High-Speed Train Project
Specifications - Ankara-Istanbul High-Speed Train Project, Turkey
| Key Data |
| Operator | TCDD |
| Opening date | 2006 (phase 1) 2008 (phase 2) |
| Route length | 533km |
| Maximum line speed | 250km/h |
| Gauge | 1,435mm |
| Electrification |
| Voltage | 25kv AC |
| Rolling Stock |
| Builder | CAF, Spain |
| Fleet total | 10 |
| Build date | 2006–08 |
| Electrical equipment | CAF |
| Passenger capacity | 419 |
| Special Characteristics |
| | First high-speed line in Turkey |
| | Maximum speed 250km/h |
| | Massive reduction in journey times |
| | First of a series of high-speed rail routes |
| | High-speed line aimed at growing rail passenger market share to 78% |
| | Major congestion has forced the need for a high-speed rail connection between the capital city and a major population centre |