Home > Industry Projects > Heavy Railways > Alameda Corridor Freight Line
A container train takes the new alignment through the 16km trench that has saved trains crossing 200 level crossings on the short 32km route to the ports.
Copyright 2007 SPG Media Limited a subsidiary of SPG Media Group PLC